REC and the Park’s and Rec. Dept.. have been working with project manager VHB Engineering, the CT DOT, and HVCEO throughout 2006 on cost estimates, best routes, and project scheduling. After interviewing 6 engineering firms, Fuss and O’Neill Inc. was selected to design our bike path.
The trail’s “official” name is the Still River Greenway
Its first phase will be roughly 2.5 miles long
The northernmost point will be at 777 Federal Rd.
The southernmost, north of the Corn Maze on 133
Accessible from either as well as at Town Hall
The trail’s14-ft width will consist of 10 feet of paving bordered on each side by 2 feet of crushed stone
Design Firm Selected; Fall 2006
Public Input/ Path Design – Winter 2007
Approvals and Permitting – Winter 2007-Fall 2007
Bidding Process– Fall 2007-Winter 2008
Groundbreaking — Spring 2008
Completion — Fall / Winter 2008